ISP logo
Menu

Harvey Bullen

placeholder
Harvey Bullen

Harvey Bullen

Associate Consultant - Offshore Wind - Site

Harvey joined LSP Renewables in 2025, marking the beginning of his recruitment journey in the renewable energy sector. With a strong passion for sports and competition, Harvey brings energy, determination, and a team-oriented mindset to his role.

At LSP, Harvey will be focusing on both permanent and contract recruitment across key areas within the renewable energy industry. 

Excited to learn from experienced colleagues and grow alongside fellow new starters, Harvey is ready to contribute to LSP’s mission of powering a greener future.

Harvey Jobs

Offshore Wind

Senior Authorised Person

United Kingdom - United Kingdom

Fulfil the following roles in accordance with the Clients Operational Safety Rules on systems up to 400kV: Senior Authorised Person (L3) Safety Coordinator System Controller Participate in all provided training and authorisation processes to achieve and maintain required authorisations for the Vanguard Offshore Wind Farm. Support the Lead SAP with the implementation of the safety from the system process by embedding company procedures and operational instructions for both onshore and offshore activities. Train and direct other SAPs and team members on the application of the rules.  Take responsibility in ensuring Safety From The System is achieved and all required documentation is prepared and issued prior to all work commencing. Assess each job on a task by task basis. Identifying all necessary precautions. Supervise Contractors and ensure use of correct PPE, equipment and working practices. Prepare/review Method Statements and Risk Assessments for work on site. Support the Location/Responsible Manager in the development and production of all required Local Management Instructions. Fully support the Location/Responsible Manager and coordinate the necessary documentation control procedures associated with Clients Operational Safety Rules. Ensuring known status at all times. If necessary, Participate in onshore shift rotation and 24/7 callout rota during transitional phase of commissioning. Carry out Permit reviews and share lessons learnt between other sites. Ensure that the technical information provided by the Commissioning Team is sufficient to allow safe energisation and challenge where needed.  DELIVERABLES Arrange necessary Safety Documents for work on the 400kV, HVDC/OFTO and WFO plant & apparatus, working alongside National Grid Senior Authorised Persons and coordinate cross boundary activities via the Record of Inter System Safety Precaution (RISSP) process. Coordinate Senior Authorised Person tasks/activities on and offshore. Support the Location/Responsible Manager with the preparation of all site specific training, assessments and audits required for personnel to be authorised for works on the Vanguard Offshore Wind Farm. Support the Commissioning Manager with the specification and procurement of the approved tools and equipment that will be required to implement the Clients Operational Safety Rules at the Offshore Wind Farm. CERTIFICATIONS Senior Authorised Person (SAP) status within a Distribution Network Operator, National Grid or Offshore Wind Farm to 400kV. Relevant technical education, for example, time served apprenticeship or similar with a HNC qualification (or equivalent) in an electrical engineering discipline. IOSH/NEBOSH Certification. Valid National Grid Persons (Substations) certification. OTHER REQUIREMENTS Significant and demonstrable experience working in a similar capacity. Proven track record in a Client role Self-starting with planning/coordination and problem solving abilities. Good standard of IT literacy (i.e. MS Office). Ability to produce project specific documentation as required to support the project and implementation of Company procedures. Provide all standard Personnel Protective Equipment (PPE) as required to perform your role.