ISP logo
Menu

Jobs

placeholder

Jobs

SAP - 66kV

Posted 5 days ago
Apply Now
United KingdomContract
Salary: CompetitiveSectors:Offshore WindJob Reference: BH-7378
Our client is seeking a Senior Authorised Person (SAP) up to 66kV to join their team on an offshore wind project.
 
Key Responsibilities
  • Fulfil the following roles in accordance with Operational Safety Rules on the WFO systems up to 66kV: 66kV Senior Authorised Person
  • Participate in all provided training and authorisation processes to achieve and maintain required authorisations, as stated above, for the Offshore Wind Farm.
  • Provide coordination and Safety Rules technical support for the project
  • Take responsibility in ensuring Safety From The System is achieved and all required documentation is prepared and issued prior to all work commencing.
  • Assess each job on a task-by-task basis. Identifying all necessary precautions as required.
  • Carry out onsite supervision of Persons and third party contractors whilst ensuring the use of correct PPE, equipment and working practices throughout.
  • Prepare/review Method Statements and Risk Assessments for work on site.
  • Support where required, the Location/Responsible Manager in the development and production all required Local Management Instructions.
  • Support where required, the Responsible Manager coordinating the necessary documentation and control procedures associated with Operational Safety Rules. Ensuring known status at all times.
 
Requirements
  • Senior Authorised Person (SAP) status within a Distribution Network Operator, National Grid or Offshore Wind Farm (up to 66kV)
  • Relevant technical education, for example, time served apprenticeship or similar with a HNC qualification (or equivalent) in an electrical engineering discipline.
  • IOSH/NEBOSH Certification or equivalent Safety Passport/Competency Card.
  • Full GWO Certification (inc. Advanced Rescue and Enhanced First Aid)
  • HUET with CA-EBS
  • GWO Slinger/Banksman (or equivalent)
  • Senior Authorised Person (SAP) status within a Distribution Network Operator, National Grid or Offshore Wind Farm (up to 66kV .
  • Relevant technical education, for example, time served apprenticeship or similar with a HNC qualification (or equivalent) in an electrical engineering discipline.
  • IOSH/NEBOSH Certification or equivalent Safety Passport/Competency Card.
  • Full GWO Certification (inc. Advanced Rescue and Enhanced First Aid)
  • HUET with CA-EBS
  • GWO Slinger/Banksman (or equivalent)
 
 
 
Deliverables
  • Arrange necessary Safety Documents for work on the 66kV, HV Plant and Apparatus
  • Support the Location/Responsible Manager with the preparation of all site specific training, assessments and audits required for personnel to be authorised for works on the Offshore Wind Farm.
  • Witness Cable Phasing activities onboard the Foundation package AWC vessel. Apply segregation for Cable Connection works later in programme.
  • Arrange necessary Safety Documentation, Commissioning Switching Programmes and other relevant documentation concerned with the energisation and commissioning of the 66kV WFO network.
  • Support the Commissioning Manager with the specification and procurement of the approved tools and equipment that will be required to implement the Operational Safety Rules at the Offshore Wind Farm.
Apply Below Now !